Design & Construction

Patterson Building Group were appointed as head contractor to undertake the Design and Construction of Storage King Leppington, NSW. 

This purpose-built project involved site clearing and the construction of a four-storey self storage facility combining modern design with practical functionality, featuring full perimeter drive-around access, external drive-up units, and internal storage spaces tailored to meet the evolving needs of both residential and commercial customers. 

Strategically positioned along a key growth corridor to the Western Sydney Airport, this modern facility is in one of Sydney’s fastest-growing urban areas. 

Design & Construction of Fire Rebuild

Patterson Building Group were appointed by School Infrastructure NSW as head contractor to undertake the Design and Construction of the Dubbo South Public School Fire Rebuild. 

Our work involved the following Milestones: 

Milestone 1
Final Detailed Design Report 

  • Engagement of relevant consultants to complete Detailed Design, including adherence to Educational Facilities Standards and Guidelines (EFSG) and incorporation of Technical Stakeholder Group (TSG) and Project Reference Group (PRG) complete these works
  • Satisfy all Pre-Commencement Conditions. 

Milestone 2
Construction of a single storey Block G1 

  • Construction of 5 general learning spaces, special programmes, staff facilities, storage, and amenities with associated external works; 
  • Make good of fire damage to the adjacent car park. 

Design & Construction

Aged Care Dwellings and Facility

Patterson Building Group was appointed as head contractor for the design and construction of Kintyre Country Living in Dubbo. Our work involved the construction of independent living units, a country club and an aged care facility.

The aged care facility within the village comprised of a basement with car-parking and service area, ground and first level areas with residential rooms and nurse staffing areas in the wings, and the central core having reception, and back of house areas.

The construction was generally a concrete basement with load-bearing block work, PT suspended slab system with reinforced concrete columns and steel framing and trusses. The work included hydraulic, mechanical, fire, electrical, lift, laundry, kitchen and servery areas.

Design & Construction

Patterson Building Group was appointed as head contractor for the Design and Construction of the Country Club and associated amenities including a swimming pool, tennis court and bowling green for Kintyre Country Living in Dubbo.

Design & Construction

Patterson Building Group Pty Limited was appointed by Stockland as head contractor to undertake the Design and Construction of 12 townhouses including detached garages.

The townhouses comprise of concrete slab on ground, timber frames and trusses, wall cladding and hebel, solar panel installation to garages, landscaping works including pathways, driveways and planting.

Internal areas consisting of plasterboard walls and ceilings, carpet and tile floor coverings, wet areas fit-out, kitchen installations and staircases.

Design & Construction

Patterson Building Group was appointed by Stockland Development as head contractor to undertake the Design & Construction of 61 dwellings.

Our work involved pad preparation, all inground services, construction of the dwellings and garages, all landscaping and fencing.

Design & Construction

Patterson Building Group were appointed by Stockland Development as head contractor to undertake the Design and Construction of 35 Townhouses inclusive of detached garages at Birdwing Street and Joey Crescent, Leppington.

The project was delivered in three separable portions and comprised of:

  • Site Set-out, form, reo and pour concrete slabs;
  • Framing and truss installation, wall cladding and roofing;
  • Brick work to entry areas and garages;
  • Internal areas consisting of plasterboard walls and ceilings, carpet and tile floor coverings, wet areas fit-out, kitchen installations, services installation and staircases;
  • Solar panel installation to garages;
  • Landscaping works including pathways, driveways and planting;
  • Front & Back tiled porches & Alfresco areas;
  • External metalworks including permanent fencing, handrails and balustrades.

College Relocation – Building 5

Patterson Building Group were appointed by the University of Technology Sydney as head contractor to undertake the upgrade and refurbishment of Building 5 – Blocks B, C and D to facilitate the relocation of UTS College, Haymarket.

Our work included upgrading services, new partitions, painting, new flooring and the relocation of furniture and fittings.

Façade upgrade works – Shepherd Street carpark

Patterson Building Group were appointed by The University of Sydney as head contractor to undertake the facade upgrade works of the Shepherd Street carpark for Building J10 at The University of Sydney.

The project involved the following:

  • Demolition of existing concrete parapet walls to 6 levels around perimeter;
  • Installation of tensile mesh to 6 levels around perimeter;
  • Concrete remediation works throughout car park to repair cracking and spalling;
  • Installation of structural steel to rooftop for mesh net and raptor rail system;
  • Installation of new crash barrier throughout the perimeter;
  • New line marking and signage to car spaces;
  • Installation of light spill panels to 6 levels around perimeter.

C25 Lowy Atrium balustrade height increase

Patterson Building Group were appointed by The University of New South Wales as head contractor to undertake the installation of the new handrail to the existing balustrade of the c25 Lowy Cancer Research Centre at The University of New South Wales.

The atrium balustrade height increase was across 5 levels of the Lowy Research Centre.

Block W Carpentry

Patterson Building Group was appointed by TAFE NSW as head contractor to undertake the construction of the new Block W carpentry building, located in the Muswellbrook Shire Local Government Area.

Our project involved the following:

  • Construction of a new carpentry workshop, classrooms, accessible WC, and services rooms;
  • Demolition of Block K:
  • Upgrade wall framing and cladding to existing Storage Shed;
  • New services infrastructure including sewer and stormwater diversion;
  • New Asphalt driveway and carparking;
  • External pathways, retaining walls and landscaping.

Construction of Clubhouse

Patterson Building Group were appointed by MHE Property Co Pty Limited as head contractor to undertake the construction of the Stratford Gardens Clubhouse Tahmoor.

The construction works comprised of

  • Site Set-out
  • Form, reo and pour concrete slabs
  • Structural Steel Framing
  • Stone cladding and roofing
  • Services installation
  • Internal areas consisting of plasterboard walls and ceilings, carpet and tile floor coverings, and wet areas fit-out

Design & Construction

Patterson Building Group were appointed by Anglican Church Growth Corporation as head contractor to undertake the design and construction of three SDA Group homes, located between Tristram Road & Boyer Road in the Northern Beaches Local Government Area, Beacon Hill.

The project accommodated a total of 8 NDIS participants and consisted of the following works:

  • Dwelling 7 (3 Bedroom & 3 Bathroom Home
  • Dwelling 7A (3 Bedroom & 3 Bathroom Home)
  • Dwelling 7B (2 Bedroom & 2 Bathroom Home
  • Surrounding hard and soft landscaping

Design & Construction

Patterson Building Group was appointed by RSL LifeCare as head contractor for the Design and Construction of Stages 3-5 of the new aged care facility at RSL LifeCare Dumaresg Village, Nowra.

Our work involved the construction of 30 independent living units inclusive of detached carports as well as the refurbishment of a heritaged listed homestead. The project was divided into three stages/seperable portions referred to as 3, 4 and 5.

  • Stage 3 consisted of 10 ILU’s which comprised 6 suspended ILU’s and 4 slab on ground ILU’s
  • Stage 4 consisted of 13 ILU’s which comprised 13 slab on ground ILU’s
  • Stage 5 consisted of 7 ILU’s which comprised 7 slab on ground ILU’s; and
  • Concurrent to all stages, the refurbishment of a heritage listed homestead under the supervision of a heritage architect.

Design & Construction

Patterson Building Group were appointed by Levande Pty Limited as head contractor to undertake the design and construction of 36 Independent Living Units at Waratah Highlands, Bargo.

The project was delivered in four portions and comprised:

  • Site Set-out
  • Form, reo and pour concrete slabs
  • Framing and truss installation
  • Wall cladding and roofing
  • Brick work to entry areas and garages
  • Services installation
  • Internal areas consisting of plasterboard walls and ceilings, carpet and tile floor coverings, wet areas fit-out, kitchen installations and staircases
  • Solar panel installation to garages
  • Landscaping works including pathways, driveways and planting

Get in Touch

Suite 2, Level 7, 189 O'Riordan Street
MASCOT NSW 2020
  • Tel: 02 9662 6522
  • Fax: 02 9662 6533
10 Belmore Street,
WOLLONGONG NSW 2500
  • Tel: 02 4283 3044
  • Fax: 02 4283 5122
Suite 3, 161 Lambton Road
BROADMEADOW NSW 2292
  • Tel: 02 8197 6039
Unit 12, Hill Station Business Park
61-63 Sheppard Street
HUME ACT 2620
  • Tel: 02 9662 6522





    We acknowledge the Traditional Custodians of the land in which we work. We recognise and respect their enduring connection to the land, waters, and community. We pay our respects to the Elders past, present, and emerging for their stewardship of Country and cultural heritage.