Patterson Building Group were appointed by Kennards Self Storage as principal contractor to undertake the Design and Construction of a Self Storage Facility in Camperdown.
The project involved the extension to the existing Self Storage Facility with works including:
- Site clearing
- Two level basement, excavation inclusive of piling, ground anchors and a fully tanked shotcrete shoring system
- Basement slab on ground and five suspended slabs, giving a total structure of six floors
- Five levels of Self Storage fit out, ground floor parking with retail space
- On-site stormwater detention and management of potential flood levels
- Combination of masonry, glazed and precast concrete façade
- Structural steel roof framing system
- External landscaping and public domain works.