Patterson Building Group Pty Limited was appointed by TAFE NSW as head contractor to undertake the cladding replacement for Buildings A and V at Brookvale TAFE. All works were carried out with zero incidents and within an active TAFE campus.

Patterson Building Group Pty Limited was appointed by The University of New England as head contractor to undertake the construction of a new Animal Studies Facility. 

The works consisted of the demolition of an existing building, including the removal of hazardous materials, and the construction of a new building consisting of concrete piers and slabs, steel structures and specialised Kingspan panels. 

Patterson Building Group was appointed to undertake the remediation and construction of the UNE Pool & Amenities Upgrade Project. The scope of works involved the internal upgrade of the existing pool to bring it up to current codes and regulations, including the provision of new mechanical & filtration plant rooms & equipment & the total internal refurbishment of the existing Sport UNE amenities. 

Patterson Building Group Pty Limited was appointed by The University of Newcastle as head contractor to undertake the interior and exterior works for the Maths Building. 

The work includes electrical, civil, mechanical, hydraulic, structural and supply of materials, to the campus entry and Maths building refurbishment. 

Patterson Building Group Pty Limited was appointed by The University of New South Wales as head contractor to undertake the fitout of J17 Ainsworth on Level 5. 

The works include the refurbishment of new offices, meeting rooms, learning spaces, lecture theatre and a new kitchen. 

Patterson Building Group Pty Limited was appointed by The University of New South Wales as head contractor to undertake the refurbishment of the ground floor and mezzanine levels at the Red Centre in Building H13. 

The works included the demolition, stripout and fitout to spaces used for both student studies, lectures and events hosted by The University of New South Wales. 

Our work involved new timber cladding to mezzanine floor and ceiling, collaboration, study and breakout areas, new kitchen, external bench seating, accessible entrance, amphitheatre and also a 3D printing room. 

Patterson Building Group was appointed as head contractor on behalf of UNSW Global for the fitout of their premises at Kensington. The scope involved the fitout of levels 1 west and 2 east and included newly refurbished classrooms, offices, interview room and physics lab, as well as a new kitchen, bathroom and student breakout area. 

Patterson Building Group Pty Limited is appointed by The University of Newcastle as head contractor to undertake the construction of the new STEMM Enabling Glasshouses. 

The work includes electrical, civil, mechanical, hydraulic and structural drawings and the specification, for Maths Building Internal & External Works. 

Patterson Building Group was appointed the Head Contractor for the refurbishment works carried at at UNSW, E15 Qudrangle.

The scope of works consisted of the refurbishment of class rooms within the E15 Quadrangle Building. In addition to this, all rooms were stripped out prior to works commencing. After the strip out, PBG installed all new services including: Electrical, Hydraulic, Fire,Mechanical, Audio Visual and associated works.

Patterson Building Group was appointed head contractor on behalf of UNSW Global for the refurbishment of their premises at Rosebery.   The scope involved the refurbishment of Part Ground floor, Levels 1 and 2 as well as the upgrade of mechanical, electrical, fire, hydraulic services for compliance. 

The project was staged to enable the occupants of each floor to be progressively decanted and recanted into their new workstation areas as they became available upon completion of each stage.  This process was repeated until the fitout was complete.

The work also included the redesign of communal kitchens and breakout areas with new carpets, fixtures, fixed and loose furniture and internal planting.

The works  at UON, Biology Building, consisted of the refurbishment of the lower ground floor of the Biology Sciences Building to complete the modernisation of the laboratory spaces within the building.  Our work also involved the upgrade of the building’s fire compliance to provide new facilities for the Conservation Biology Research Group. 

All works were undertaken in occupied learning areas; protocols and procedures were put in place to minimise both dust and noise to ensure the occupation of surrounding areas. 

Patterson Building Group Pty Ltd was awarded Head Contractor to undertake the refurbishment works for UNSW Fig Tree Hall & Goldstein Hall.

Our work involved two components: the renovation of an existing cold shell space in the new Senior’s College to create new 3 tiered lecture theatres, 2 seminar spaces, foyer and toilet amenities including air conditioning and mechanical ventilation to the renovated space; a new roof to replace existing including make steeper, new paving to courtyard, new tiling to pool including new pump equipment and lighting, installation of new glazing to replace existing and other minor works throughout the building.

Get in Touch

Suite 2, Level 5, 189 O'Riordan Street
MASCOT NSW 2020
  • Tel: 02 9662 6522
  • Fax: 02 9662 6533
10 Belmore Street,
WOLLONGONG NSW 2500
  • Tel: 02 4283 3044
  • Fax: 02 4283 5122
Suite 3, 161 Lambton Road
BROADMEADOW NSW 2292
  • Tel: 02 8197 6039