Patterson Building Group Pty Limited was appointed as head contractor to undertake the refurbishment works to the Meat & Allied Trades Building at Granville TAFE.
The works include but are not limited to the demolition and strip out of existing rooms, including the removal of materials containing asbestos and the provision of classrooms, dry store, cool rooms, wash bay, toilets, practical area, retail space and lobby area.
Patterson Building Group Pty Ltd was awarded Head Contractor to undertake the refurbishment works for UNSW Fig Tree Hall & Goldstein Hall.
Our work involved two components: the renovation of an existing cold shell space in the new Senior’s College to create new 3 tiered lecture theatres, 2 seminar spaces, foyer and toilet amenities including air conditioning and mechanical ventilation to the renovated space; a new roof to replace existing including make steeper, new paving to courtyard, new tiling to pool including new pump equipment and lighting, installation of new glazing to replace existing and other minor works throughout the building.
Patterson Building Group was appointed to deliver the refurbishment of four levels(including basement), two new lift shafts and multiple structural alterations, extensions and infills to the Manly Police Station.
The programme was an extremely tight five month time frame and required simultaneous trade coordination completing the lift shaft and other structural works whilst finishes trades like painting and carpet were deployed in adjacent areas.
The site itself was very tight with minimal room inside and around requiring delicate material deliveries and handling.
Multiple trades were working simultaneously in harmony resulting in on time delivery free from any WHS or Environmental incidents.